شارك هذا المقال
ISO 9001 allows you to determine that one of its requirements is not applicable to you, provided you can justify it and the non-applicability does not affect your ability to deliver conforming products and services. ISO 14001 and ISO 45001 offer no equivalent route through their requirements. Separately from that, all three ask you to draw a boundary around the management system, and it is the boundary rather than the applicability argument that reaches your certificate.
Both decisions sit in clause 4.3, and both are audited. They fail in different ways, so it is worth keeping them apart when you read your own scope statement.
Applicability, which used to be called exclusion
ISO 9001:2008 permitted exclusions and confined them to clause 7, and most organizations listed them in a quality manual. ISO 9001:2015 removed the word. Clause 4.3 now asks you to determine the boundaries and applicability of the quality management system, to apply every requirement that is applicable within the scope you determined, and to maintain the scope as documented information stating the products and services covered together with the justification for any requirement determined not to apply.
The requirement declared not applicable most often is clause 8.3, design and development. It is a legitimate determination where a customer supplies a complete design and you build to it. It stops being legitimate at the point somebody in your organization makes a design decision: selecting a material grade, sizing a component, resolving on a shop drawing something the customer's drawing left open. The auditor's question is who chose that, and if the answer is one of your own engineers, clause 8.3 applies to you. Calling it not applicable is then a nonconformity against clause 4.3, and the absence of design review, verification and validation records is a second finding against 8.3 itself.
The other common pattern is a requirement set aside because the organization does not own the means of meeting it. Clause 7.1.5 is not made inapplicable by sending instruments to an external calibration provider. Sending them out is how the requirement is met, and the arrangement then falls under clause 8.4, which makes externally provided processes your responsibility to control. Outsourcing a process moves where the work happens and leaves the clause with you.
The boundary is what appears on the certificate
The other half of clause 4.3 is where the system starts and stops: which legal entity, which sites, which activities. That determination becomes the scope statement on your certificate and in our public register, and it is the part a buyer or a tender committee actually reads.
Here the two environmental and OH&S standards are more prescriptive than ISO 9001. ISO 14001 clause 4.3 states that the scope must not be used to exclude activities, products or services that have or can have significant environmental aspects, or to evade compliance obligations, and that the credibility of the system depends on the choice of boundaries. ISO 45001 clause 4.3 requires the scope to take in the activities, products and services within the organization's control or influence that can affect its OH&S performance. A leased yard, a night shift, and the workers of a contractor working under your direction are all inside that boundary whether or not the scope statement mentions them.
The failure mode is an organization that certifies the part of itself that is ready. Head office is in scope and the workshop is not. One subsidiary in a group holds the certificate and the operating companies do not. A contractor lists a commercial address and leaves every project site outside the boundary. Nothing on the certificate is untrue in any of these cases, and each one covers a fraction of what the reader assumes they have bought. Where the excluded part carries the significant environmental aspects or the serious hazards, the exclusion is itself a clause 4.3 nonconformity under ISO 14001 or ISO 45001.
What we do with it during the audit
We read the scope statement at Stage 1, against the activities on your trade license, your project list and your customer contracts, along with the justification for anything you have determined not applicable. Checking that the declared scope matches the work is one of the things Stage 1 exists to do, because a mismatch found there can be settled before Stage 2, and a mismatch found at Stage 2 is a finding.
We also read it in the other direction, because a scope drawn wider than the organization operates causes its own problems. Audit duration follows from the standard, your headcount, the number of sites and the processes in scope, and the fee follows from the duration. A scope written expansively to look impressive in a tender buys you a longer audit against processes you do not perform. A scope that names activities we are not accredited for is a different matter again: we check the sector against our own accreditation scope before quoting, and where it does not cover what you need, we say so and decline the work.
One practical habit closes most of this. Once a year, read your scope statement beside a list of what your organization did in the last twelve months, and read your applicability justification beside the same list. If a new service, a new site or a new design responsibility appeared during the year and neither document changed, one of the two is now wrong.
When somebody verifies one of our certificates, they see the scope statement, the standard edition, the sites and the status. Your applicability justification stays in your own documented information, where we sample it. The boundary you drew is the part that travels with the certificate into other people's assurance files.