القطاعات
Construction and contracting
In contracting, a management system is often written for the tender and then left in the office. We schedule at least one audit on active works while work is underway, because that is where the system can be verified.
تحدّث إلى مدقق
أخبرنا بالمعيار وعدد العاملين وعدد المواقع، ونعود إليك بالنطاق وأتعاب ثابتة خلال يوم عمل واحد.
طلب عرض سعرWhat auditors look at in this sector
Audit findings cluster in predictable places. These are the areas your lead auditor will spend the most time on, so you can prepare for them rather than be surprised by them.
- Subcontractor prequalification, control and site induction records
- Permit-to-work systems for height, confined space, excavation and hot works
- Inspection and test plans, and whether hold points were actually held
- Method statements and risk assessments matched against what is happening on site
- Site waste management, dewatering and dust control against emirate requirements
- Competence and third-party labor supply arrangements