Skip to content
VISCOUNTQuality Certifications

Standard revision

What a Stage 1 audit checks, and what it decides

Stage 1 determines whether you are ready for Stage 2. Its objectives under ISO/IEC 17021-1, and the readiness finding that moves a Stage 2 date.

Published

Share this article

Stage 1 determines whether your management system is ready to be audited at Stage 2, and one of its available outcomes is that it is not. It is an audit in its own right, with objectives set in clause 9.3.1.2 of ISO/IEC 17021-1: audit your documented information, evaluate conditions at your sites, and confirm that your internal audits and management review have been performed. Where those checks come back short, your Stage 2 date moves.

Stage 1 also settles the facts the rest of the audit runs on. We come away with your scope as it actually stands: the sites, the shifts, the processes, the statutory and regulatory requirements applying to your operation, and the controls you have established over them. Audit duration is derived from the standard, your headcount, the number of sites and the processes in scope, all of which you gave us in the informative questionnaire before any proposal. Where what we find differs materially from what the questionnaire said, the duration follows the operation rather than the form.

That information is what the Stage 2 audit plan is built from. The plan names the dates, the audit team, and which sites, shifts and processes will be visited, and you receive it in advance. The plan is only as good as what Stage 1 established. Where an audit lands in a week when your one active project is between phases, there is very little for a site visit to sample, and that constraint was knowable at Stage 1.

The check that moves dates

The readiness finding we raise most often at Stage 1 is a system that exists in documents and has not yet been operated. Procedures approved, a manual issued, a policy signed, and no completed internal audit and no management review to look at. Clause 9.2 and clause 9.3 of ISO 9001, ISO 14001 and ISO 45001 require both, and Stage 1 evaluates whether they are planned and performed. An internal audit is the organization checking itself against the same standard we are about to check it against. Where it has never been run, we are the first audit your system has ever had.

Neither can be compressed into the week before Stage 2. An internal audit has to cover the scope you are certifying, and a management review has to consider inputs that only exist once the system has been running: internal audit results, performance against your objectives, and what has come back from your customers. This is the most common reason a first certification takes longer than the organization planned, and Stage 1 is where it surfaces.

Stage 1 findings are documented and communicated to you, including any areas of concern that could be classified as a nonconformity at Stage 2. An area of concern is a warning with a clause number attached to it. Acting on one before Stage 2 costs you a few weeks. The same gap left in place at Stage 2 is a nonconformity with a written response and a verification window behind it, and a major one stops the certification decision until it has been corrected and the correction verified.

Between Stage 1 and Stage 2

We set the interval between the two, taking account of how long you reasonably need to resolve what Stage 1 raised. There is a limit at the other end of it. Stage 1 reached its conclusions about a system as it stood in a particular week, so where a long period passes, or where your scope, sites or processes change materially in the meantime, part of Stage 1 is repeated before Stage 2 can proceed.

What you get back from Stage 1 is the requirement, the evidence, and why the two do not meet. A consultant's gap analysis ends by telling you what to write. Ours ends at the record of what we found, because at Stage 2 we have to form an independent judgment about whatever you wrote, and the certification decision after it is taken by a reviewer who conducted neither audit. Our reasons for declining consultancy are the same reasons Stage 1 stops where it does.

Stage 1 and Stage 2 together make up the certification stage of a three-year cycle, ahead of the two surveillance audits and the recertification, and the whole sequence is set out on how certification works. A Stage 1 that moves your Stage 2 date has spent a few weeks to keep a major nonconformity off a file that somebody independent of your audit is going to read.

Share this article